SPARTAN 10 STEP PROCESS

Our Process for  Gold LEED Ratings!

LEED Gold Rating

Spartan 10 Step Process to Achieve LEED Gold Rating for your Building

#0 - Spartan Step Zero

Free No Cost Step – Define the Building Envelope Using Smart Software

Submit Desired Plan to Spartan

And Begin the Spartan LEED Process

#1 – 3D Architecture

Customer Hires Spartan –
Spartan creates 3D Architectural Model and Engineering Plan. 
Use Smart Software to create a home plan

#2 – Storm Windows

Low E – Glazing Choices Purchased with Building Envelope
High E Glass and Storm / Security Glass – Custom built from the factory with standards

#3 – Green Roofing

A new roof, properly designed and ordered direct from the factory, will reduces costs while building a SIP Panel Building Envelope.
Lower your heating / cooling costs.

#4 – SIP Building Envelope

The Building Envelope Structured Insulated
SIPs are the key to energy efficient building
SIP buildings use approximately half the energy of conventional

#5 – Ventilation and HVAC

Ventilation and HVAC –
Heating, ventilation, and air-conditioning (HVAC) comprise the “engine” that drives the comfort systems in most structures.

#6 – Net Zero Energy

Net zero energy
Solar Panels – Water Heating
Wind Power

#7 – Home Automation

Smart Home and Building Automation
The collection of methods, the number of points and the specific requirements for similar points vary across the LEED standards

#8 – Points Lighting

As a primary building system, lighting has a critical role to play in sustainable buildings.
A fancy way of saying energy-efficient lighting.

#9 – Landscape Design

Spartan with Geologists and Hydrologists on staff, brings a commonsense, cost-effective approach to addressing the escalating issue of Water Conservation & Drainage

#10 – Interior Designers

Particleboard and medium-density fiberboard (MDF) are almost always made with a urea formaldehyde (UF) binder.
Conventional drywall is quite attractive.